Harvesting · processing · products · Mexico · Caribbean · United States

Stop sargassum before it reaches the sand.

Raking a beach is a losing race against the tide. We engineer a barrier around the way your bay actually moves water, guide the seaweed to one point offshore and pump it ashore before it rots — then process it into agricultural biostimulant, biochar, renewable energy and building material. One company, from the water to the finished product.

Operating at Soliman Bay, Quintana Roo — barrier installed, Geocylinder® concentrating, hydraulic pumping and dewatering live.

What is actually arriving

It stopped being a seasonal nuisance around 2011.

Sargassum is a free-floating seaweed native to the Atlantic, and in open water it is habitat rather than a problem. Then the blooms changed scale. What is now called the Great Atlantic Sargassum Belt has grown from roughly one million tonnes in 2011 to tens of millions, and it returns every year.

On the water it is seaweed. On your sand, within about 48 hours, it is something else.

  • Hydrogen sulfideDecomposing sargassum releases the gas responsible for the smell. At sustained concentrations it causes headaches, nausea and respiratory irritation — for guests and for the crews clearing it.
  • Water quality and reefThick mats block light and strip oxygen from the shallows, smothering seagrass and nearshore reef in exactly the water your guests swim in.
  • The sand itselfLeft to rot, it stains and compacts the beach. Raking it out takes sand with it, season after season.
  • CancellationsBeaches close, bookings move, and the reputational damage outlasts the arrival by months.

Soliman Bay

One line. Two conditions.

Sargassum banked on the seaward side. Clear water on the side your guests use. That is the whole product, photographed on a working deployment.

Why most barriers disappoint

A barrier in the wrong place moves the problem next door.

Sargassum does not arrive evenly. Four forces decide where it lands, and they differ from one bay to the next — sometimes from one headland to the next. A straight line of floats dropped across a bay fights all four at once, and loses.

Force 01

Season

Volume and timing shift dramatically month to month and year to year. Last season is a poor guide to this one.

Force 02

Wind and waves

Direction and energy decide how hard the biomass is pushed onshore, and where along your frontage it stacks up.

Force 03

Longshore current

Drift carries floating material along the coast. Work with it and it does your sorting for you.

Force 04

Bay geometry

Reef openings, headlands and shoreline orientation focus arrivals onto particular stretches of sand.

The system

Eight steps, engineered for your bay.

Every deployment starts with the water, not the catalogue. Scroll — the plan follows.

1821 1214 166 83 Your beachfront Sargassum held offshore Protected water Floating diverter Geocylinder® Dewatering Open sea Sargassum arrives 0 200 m Depths in metres N

01 Study

01

Study

Bathymetry, wave direction, currents, reef openings and arrival history for your specific frontage.

02

Model

Alignment options tested against the hydrodynamics. The curve is a calculation, not a preference.

03

Manufacture

Modular float sections and marine-grade geotextile, fabricated to the tolerances your site needs.

04

Deploy

Progressive installation and tensioning, with anchoring matched to your seabed.

05

Intercept

Arrivals are guided along the barrier rather than blocked, so the system works with the current instead of straining against it.

06

Concentrate

The Geocylinder® gathers the biomass at one predictable point — turning a dispersed problem into a pumpable one.

07

Pump

Low-noise electric hydraulic transfer to shore through a flexible line. No excavators on your beach.

08

Dewater

Geotextile containment lets water drain and holds the solids. Volume drops sharply, and so does haulage.

The back end

Removed is not the same as solved.

A beach clean-up moves your problem to a landfill and sends you the bill twice — once to lift it, once to bury it. Dewatered biomass leaves your site as feedstock, not as waste. It goes to conversion, and what comes out is sold — as a product where the material allows, and as energy where it does not.

1.00 tdewatered dry matter
Conversionroute set by what your material actually contains
Productsold, not buried

Agricultural biostimulant

A liquid concentrate that improves root growth and stress tolerance. Sold to growers and distributors, and the most commercially advanced sargassum product on the market today.

Biochar and carbon removal

Stable carbon for soil, made by pyrolysis. Holds its carbon for centuries, so it also carries a carbon-removal credit where a registry accepts marine biomass.

Waste to energy

Renewable gas, hydrogen or power, depending on route. This is where the fractions that cannot become products go — contaminated, mixed or off-specification material that would otherwise be landfilled.

Compost and soil conditioner

The outlet for surplus and off-specification material. Never the profitable route, but the one that keeps the site running when arrivals spike.

Construction blocks

Washed biomass with sand and binder, pressed into blocks for local building. Freight-limited, so this stays close to the coast that produced it.

Thirteen routes were assessed on identical assumptions; these are the ones that carry the economics. Which run at your site is decided by testing your own material, not by catalogue.

What turnkey actually means here

  • One counterpartyFrom the water to the finished product. You are not coordinating a barrier contractor, a haulier and a disposal site.
  • Nothing to landfillProduct routes take what meets specification; waste to energy takes what does not. Nothing needs a landfill cell, so there are no tipping fees and no long-tail liability attached to your property.
  • Documented and reportableVolumes measured every operating period, with the destination and end use recorded — evidence you can put in a sustainability report or hand to a regulator.

Soliman Bay, Quintana Roo

Managed and unmanaged, on the same frontage.

The full system — barrier, Geocylinder®, pumping and dewatering — has been operating on this frontage through active sargassum arrivals.

Soliman Bay frontage covered in decomposing sargassum
UnmanagedArrivals reach the sand, spread across the frontage and begin to decompose.
Soliman Bay frontage clear, with the system operating
ManagedThe same frontage with the barrier, Geocylinder® and pumping in operation.

Both photographs were taken on the Soliman Bay frontage on different days and from different positions. They are observational documentation, not a controlled comparison — viewpoint, arrival intensity and sea state vary between visits.

What changes on your frontage

Fewer arrivals on the sand. Less machinery. Measured volumes.

A usable beach during arrivals

Sargassum is held offshore in the managed zone instead of spreading across your full frontage, so the guest-facing stretch stays open through the season.

No rotting, no hydrogen sulfide

Speed is the whole point. Material moved before decomposition begins does not produce the smell, the sulfide exposure or the sand staining that follow a slow manual clean-up.

Heavy plant off the shoreline

Hydraulic pumping replaces the excavators and front loaders that compact sand, damage turtle habitat and take beach out of service while they work.

Volumes you can report

Every operating period is measured and logged. That documentation supports your environmental reporting and your conversations with the authorities.

How we work

Three phases, separately contracted.

You are not asked to commit to an installation before anyone has looked at your bay. Each phase is defined, priced and paid on its own, with a clear decision point before the next begins.

Phase 01

Engineering and design

We study the site and define the system it needs — before any equipment is discussed.

  • Coastline geometry, bathymetry and seabed review
  • Wind, wave, current and arrival-pattern analysis
  • Barrier alignment options and the recommended one
  • Geocylinder® placement, pumping route and dewatering layout
  • Infrastructure, access and preliminary permitting review

Typically 4–8 weeks · standalone service

Phase 02

Manufacture and deployment

We fabricate to the design, install it, and hand over a commissioned system.

  • Detailed engineering and final configuration
  • Modular diverter sections, anchoring and connections
  • Pumping equipment and dewatering infrastructure
  • Marine installation, tensioning and alignment
  • Commissioning and operating tests

Milestone-based · title passes on final payment

Phase 03

Seasonal operations

We run the system through the season and report what it moved.

  • Pre-season readiness and mobilisation
  • Barrier inspection, maintenance and adjustment
  • Daily pumping and dewatering operations
  • Volume measurement and incident logging
  • Coordination with transport and final destination

Multi-year agreements · 3–5 year term

Who we work with

One frontage, or a whole bay.

Working across Mexico · Caribbean · United States — from a single hotel beachfront to a bay-wide municipal programme.

Hotels and resorts

Protect a defined guest frontage and the amenity zone that goes with it.

Residential communities

A shared system across private shoreline, sized and cost-shared between owners.

Marinas and islands

Configurations that keep navigation channels and tourism assets workable.

Municipalities

Bay-wide operations across public beach and destination tourism zones.

Who delivers this

Three companies, one chain.

Harvesting, conversion and site development — the whole chain from the water to the finished product. No single firm covers all three, which is why this is built as a partnership rather than a contract chain.

Golden Tides

Collection & dewatering

Mexico · Caribbean · United States

Designs and operates the interception system: bay modelling, floating diverters, the Geocylinder®, hydraulic transfer and shoreline dewatering. Proven at Soliman Bay through active sargassum arrivals.

  • Dr. Brian Lapointe, PhDCo-founder — marine science & environmental strategy
  • Armando EspeletaCo-founder — investment, infrastructure & commercial development
  • Pablo BesquinCo-founder — coastal engineering & marine operations

Global Bridges Group

Conversion & programme leadership

Mexico · Caribbean · United States

Converts dewatered biomass through commercially proven assets, and acts as the accountable programme manager — setting technical standards, evaluating every proposed technology on the same evidence, and confirming commercial viability before capital is committed.

  • Richard J. FishManaging partner — plasma gasification, waste-to-energy, hydrogen
  • Christopher D. MaloneyManaging partner — energy, renewables and environmental services
  • Mark A. WrightManaging partner — thermal conversion project delivery

Jacoby Development

Land, sites & development

Atlanta, Georgia

A real estate development firm with a forty-year record of turning environmentally impaired sites into working places — best known for Atlantic Station, built on a derelict Atlanta steel mill, and Porsche Cars North America's headquarters on a former Ford plant. Brings site assembly, permitting and public-private partnership structuring.

  • Jim JacobyFounder and chairman

Donate

Under construction.

We are setting up a giving programme for stretches of coastline that nobody is paying to protect — public beaches, fishing communities and turtle nesting sites. It is not open yet.

If you would like to support that work, or discuss corporate sponsorship, get in touch and we will come back to you when the programme opens.

Register your interest

Start here

Request a site assessment.

Phase 1 is a standalone piece of engineering. At the end of it you own a site assessment report, a recommended barrier alignment for your bay, and a costed proposal — whether or not you go further with us.

General enquiriesinfo@goldentidesllc.com

  • Site assessment report for your frontage
  • Conceptual bay layout with the preferred alignment
  • Geocylinder® concept and anchoring strategy
  • Pumping and dewatering layout
  • Infrastructure requirements and equipment list
  • Implementation schedule and Phase 2 proposal

We reply within two working days.